Digital Train Radio System

Example of a DTRS mastRailCorp has contracted UGL Infrastructure Pty Ltd to design, construct, commission and maintain a new Digital Train Radio System (DTRS) at about 250 locations within the rail corridor as well as more than 60 sites in tunnels throughout the electrified rail network.

Replacing the existing analogue train radio system with DTRS will fulfil recommendations from the Special Commission of Inquiry into the Waterfall train accident to provide a common platform of communication for staff working on the railway.

The DTRS will ensure that train drivers, train controllers, signallers and train guards on RailCorp's electrified network are able to communicate with each other using the same system with the same technology.

The project will involve installing new radio masts or, where possible, attaching DTRS equipment to existing infrastructure. Cabinets containing electrical and other equipment will also be installed.

The DTRS is based on the GSM-R standard now widely used by major rail operators in Europe and Asia. GSM-R systems are operational in countries including Norway, Holland, Germany, Belgium, Spain, Finland and Sweden and under development in countries including Great Britain, France, Austria and China. In Australia, this system is being installed on the Melbourne train network by the Victorian Government. With 372 kilometres of track, the Melbourne network is approximately one quarter the size of RailCorp's electrified network. Its digital train radio system comprises 69 sites that require new masts.

Work will begin between Waterfall and Sutherland to the south of Sydney.

More information about the DTRS project is in our frequently asked questions.

Community consultation

Approval process

Stage one: 21-day statutory period
Reviews of environmental factors made available for review and comment under the state Environmental Planning Policy (Infrastructure) 2007. Nearby residents, businesses and other stakeholders notified by letter and doorknocking.

Stage two: RailCorp assesses submissions
Site assessment reports prepared to address and respond to submissions.

Stage three: RailCorp determination
Determination report for each site prepared and placed on public display.

Stage four: construction
Construction will begin, with nearby community receiving additional notification at least five working days before construction begins.


Send us your feedback

There are three ways you can submit your feedback about the DTRS project

  1. Use our online feedback form
  2. E-mail us at:
    DTRSfeedback@railcorp.nsw.gov.au
  3. Write to us:
    DTRS Feedback, RailCorp Community Relations, PO Box K349, Haymarket NSW 1238

We are conducting a comprehensive program to ensure residents, businesses and other stakeholders close to proposed sites are fully informed about the scope of work involved and have an opportunity to provide their feedback.

Activities include meetings with local councils, authorities and community groups, letterbox drops and face-to-face consultation with nearby residents and businesses.

This website contains draft reviews of environmental factors (REFs) relevant to the DTRS sites. These documents contain detailed information about the type of work involved at each location, potential environmental and other impacts and mitigation strategies. The community is invited to review these documents and provide feedback about any aspect of the project.

This website will be updated as information about other sites becomes available and will also contain summary reports of feedback received and considered during the pre-construction consultation period as well as final determinations. Please use the links on this page to review the available material and submit your feedback.

Location

Proposed work

Documents

Status

Penshurst Install new communication mast and four equipment cabinets south-west of Penshurst Station. Review of Environmental Factors
(3.75MB, PDF)
Community feedback open.
Submit feedback
Jannali Install new communication mast and two equipment cabinets south of Jannali Station. Review of Environmental Factors
(3.96MB, PDF)
Community feedback open.
Submit feedback
Kirrawee Install new communication mast and two equipment cabinets west of Kirrawee Station. Review of Environmental Factors
(4.56MB, PDF)
Community feedback open.
Submit feedback
Miranda Install new communication mast and two equipment cabinets between Miranda and Caringbah stations. Review of Environmental Factors
(4.05MB, PDF)
Community feedback open.
Submit feedback
Caringbah Install new communication mast and two equipment cabinets west of Woolooware Station. Review of Environmental Factors
(3.64MB, PDF)
Community feedback open.
Submit feedback
Cronulla Install new communication mast and two equipment cabinets north of Cronulla Station. Review of Environmental Factors
(3.69MB, PDF)
Community feedback open.
Submit feedback
Oatley Install new communication mast and two equipment cabinets south-west of Oatley Station. Review of Environmental Factors
(3.65MB, PDF)
Community feedback closed.
Como Install new communication mast and two equipment cabinets north of Como Station. Review of Environmental Factors
(3.41MB, PDF)
Community feedback closed.
St Peters Install new communication mast and two equipment cabinets north-east of St Peters Station. Review of Environmental Factors
(3.90MB, PDF)
Community feedback closed.
Sydenham South Install new communication mast and two equipment cabinets south of Sydenham Station. Review of Environmental Factors
(4.15MB, PDF)
Community feedback closed.
Rockdale Install new communication mast and two equipment cabinets north of Rockdale Station. Review of Environmental Factors
(3.67MB, PDF)
Community feedback closed.
Wolli Creek Install new communication mast and four equipment cabinets south-east of Wolli Creek Station. Review of Environmental Factors
(3.25MB, PDF)
Community feedback closed.

Engadine

Add DTRS equipment to existing lift structure and install two power equipment cabinets at Engadine Station.

Review of Environmental Factors
(2.79MB, PDF)
Determination Report (230KB, PDF)

Under construction.

Goomera Ridge

Install new communication mast and four equipment cabinets south of Waterfall.

Review of Environmental Factors
(3.30MB, PDF)
Determination Report (470KB, PDF)

Under construction.

Heathcote

Install new communication mast and two equipment cabinets at Heathcote Station.

Review of Environmental Factors
(3.66MB, PDF)
Determination Report (228KB, PDF)

Under construction.

Loftus

Install new communication mast and two equipment cabinets south west of Loftus Station.

Review of Environmental Factors
(3.31MB, PDF)
Determination Report (232KB, PDF)

Under construction.

Sutherland

Add DTRS equipment to existing communication mast and install two equipment cabinets south west of Sutherland Station.

Review of Environmental Factors
(4.59MB, PDF)
Determination Report (198KB, PDF)

Under construction.

Waterfall

Install new communication mast and four equipment cabinets north east of Waterfall Station.

Review of Environmental Factors
(3.78MB, PDF)
Determination Report (458KB, PDF)

Under construction.